Transcript
The repairs were completed without issue. Since the facility was previously used for confinement, the work required to reinforce the airtight sealing was minimal.
And as long as we don't run into any issues with the cooling system test, we plan to bring in all of the remaining specimens from Facility 1.
All specimens were successfully transferred. However, we experienced a slight hiccup during transport as one of them became violent.
Luckily, the number of casualties was less than anticipated.
Please be extra careful when dealing with them. We have received reports that they are beginning to acquire a tolerance to the low temperatures.